Capital Planning and Design
UserName:
Password:
 
MIS @bjcpc.com.cn


Study on the Municipal Road Engineering and Consultation
Current Position: Home >> Our Business

Study on the Municipal Road Engineering and Consultation

  1. Conducting overall planning for the early-stage designing of municipal road engineering
  2. Study on regional traffic planning
  3. Organizing and compiling the planning scheme for road engineering and receiving approval and reply from competent government departments
  4. Organizing and compiling the designing scheme for road engineering and receiving approval and reply from competent government departments
  5. Organizing and compiling the preliminary designing scheme for road engineering and receiving approval and reply from competent government departments
  6. Organizing and compiling project proposal on road engineering
  7. Organizing and compiling feasibility report on road engineering
  8. Consultation on rail traffic planning
  9. Study on special road engineering subjects
  10. Handling the Planning Opinions, Construction Land Use Planning Permit and Construction Engineering Planning Permit
  Update:11/21/2006

Tags: Municipal Road Engineering
[Recommend] [Add to Favorites] [Print] [Close

Success Stories
The project started in 1998, lasted 3 years and finished in June 2001. The Fourth Ring Road is the urban expressway. The total length is 63.5 kilometers. The major road is enclosed and all the crosses are facilitated by overpasses.

The Fifth Ring Road rounds along the verge of Beijing city, 10-15 kilometers from downtown. It is a ring road expressway between downtown Beijing and its outskirts. The Road connects with 8 highways from the capital.




Copyright © 2006 Beijing Capital Planning and Design Engineering Consulting Corporation All rights reserved.